Which size piping may require gas piping to be purged with inert gas before service?

  1. Any size

  2. Only large diameter piping

  3. Piping that contains hazardous materials

  4. Piping that cannot contain anything listed in a specific table

The correct answer is: Piping that cannot contain anything listed in a specific table

The correct choice highlights that purging gas piping with inert gas is particularly necessary when the piping cannot contain any substances listed in a certain specification table. This indicates that the table likely includes materials or conditions that could pose safety risks or cause harm if they remain in the piping. Purging with inert gas serves to eliminate any potentially hazardous or undesirable gases within the system, ensuring that the piping is safe and ready for use. In many regulations and standards, certain chemicals and gas mixtures are identified that must not be present in the system for safe operation. By aligning the purging process with the specifications in this table, it assures compliance with safety protocols and reduces the risk of accidents or equipment failure. This approach emphasizes the importance of following industry standards to maintain safety and efficiency in gas systems, focusing on ensuring that the environment within the piping is appropriate for the intended gas service.